Which foreign project can be evaluated (M11-12) (Phương pháp đánh giá dự án nước ngoài)
Génération de l'aperçu...
Tài liệu ghi chép tóm tắt các phương pháp đánh giá dự án nước ngoài, quyết định thực hiện quyền chọn sớm, phòng ngừa rủi ro tài sản nước ngoài và các công cụ phái sinh như kỳ hạn, tương lai, hoán đổi và quyền chọn.
Description
Explain 2 methods by which foreign project can be evaluated? 1st method: -take foreign CF as given. discount that foreign CF with foreign interest rate. calculate NPV. convert NPV to domestic currency at current spot rate. 2nd method: working out the forward exchange rate for each year of the project (using spot rate& interest rate that exist between 2 countries). converting foreign CF into domestic CF using forward rate. the domestic CF are discounting with domestic WAAC. calculate NPV Companies prefer the 1st method, because they are worried about unpredictability of exchange rate over time. Why would you not exercise an option early? When might you exercise early? The option price is made up of exercise value and time value during its life. At expiry it will only have exercise value. If you exercise early you will lose the time value (which has a value up to the point of expiry, because potentially anything could happen to the share even one day before expiry – a bid might come along, an accounting black hole may be discovered). Early exercise may be worthwhile if the company announces a special dividend (shares at 500p announces a 100p special dividend, which would reduce the share price to 400p). The option holder does not receive the special dividend, the shareholder does, by exercising their option the option holder becomes a shareholder. With regard to foreign assets, what should a company hedge? Foreign assets will either be real assets (land, buildings etc) or financial assets (cash flows). Real assets will be protected in that they will rise with any inflation in the foreign country so they don’t need to be hedged. Financial assets will be affected if the foreign currency weakens – resulting in less £ when converted back, so businesses need to hedge their cash flows in overseas markets. Forwards, Futures, Swaps & Options (derivative instruments) Their value is derived from the price performance of an underlying asset. Forwards, futures and swap
Résumé IA
- Nom du document
- Which foreign project can be evaluated (M11-12) (Phương pháp đánh giá dự án nước ngoài)
- École / Cours
- Edinburgh Business School · Finance
- Contenu
- Tài liệu hướng dẫn đánh giá dự án đầu tư nước ngoài bằng hai phương pháp, giải thích về quyền chọn và phòng ngừa rủi ro tài sản nước ngoài, đồng thời giới thiệu chi tiết về các công cụ phái sinh như forwards và futures.
- Table des matières
- Ce document n'a pas de table des matières claire.
- Pages
- 12 pages
- Téléversé par
- Uni24h
Foire aux questions
Ce document est-il gratuit ?
Oui. « Which foreign project can be evaluated (M11-12) (Phương pháp đánh giá dự án nước ngoài) » est gratuit — il suffit de vous connecter et de cliquer sur Télécharger pour obtenir le fichier original.
Combien de pages compte ce document ?
Le document contient 12 pages, pour le cours Finance. Vous pouvez le prévisualiser en ligne avant de le télécharger.
Puis-je prévisualiser avant de télécharger ?
Oui. Vous pouvez prévisualiser ce document directement sur cette page avec le lecteur en ligne, puis décider de le télécharger ou non.
Which foreign project can be evaluated (M11-12) (Phương pháp đánh giá dự án nước ngoài)
Génération de l'aperçu...
Explain 2 methods by which foreign project can be evaluated? 1st method: -take foreign CF as given. discount that foreign CF with foreign interest rate. calculate NPV. convert NPV to domestic currency at current spot rate. 2nd method: working out the forward exchange rate for each year of the project (using spot rate& interest rate that exist between 2 countries). converting foreign CF into domestic CF using forward rate. the domestic CF are discounting with domestic WAAC. calculate NPV Companies prefer the 1st method, because they are worried about unpredictability of exchange rate over time. Why would you not exercise an option early? When might you exercise early? The option price is made up of exercise value and time value during its life. At expiry it will only have exercise value. If you exercise early you will lose the time value (which has a value up to the point of expiry, because potentially anything could happen to the share even one day before expiry – a bid might come along, an accounting black hole may be discovered). Early exercise may be worthwhile if the company announces a special dividend (shares at 500p announces a 100p special dividend, which would reduce the share price to 400p). The option holder does not receive the special dividend, the shareholder does, by exercising their option the option holder becomes a shareholder. With regard to foreign assets, what should a company hedge? Foreign assets will either be real assets (land, buildings etc) or financial assets (cash flows). Real assets will be protected in that they will rise with any inflation in the foreign country so they don’t need to be hedged. Financial assets will be affected if the foreign currency weakens – resulting in less £ when converted back, so businesses need to hedge their cash flows in overseas markets. Forwards, Futures, Swaps & Options (derivative instruments) Their value is derived from the price performance of an underlying asset. Forwards, futures and swap
Lire le document entier
- Nom du document
- Which foreign project can be evaluated (M11-12) (Phương pháp đánh giá dự án nước ngoài)
- École / Cours
- Edinburgh Business School · Finance
- Contenu
- Tài liệu hướng dẫn đánh giá dự án đầu tư nước ngoài bằng hai phương pháp, giải thích về quyền chọn và phòng ngừa rủi ro tài sản nước ngoài, đồng thời giới thiệu chi tiết về các công cụ phái sinh như forwards và futures.
- Table des matières
- Ce document n'a pas de table des matières claire.
- Pages
- 12 pages
- Téléversé par
- Uni24h
Commentaires (0)
Aucun commentaire pour le moment. Soyez le premier !
Module 1 2 4 Valuation cash flows, bonds, shares, projects
Finace exam (Đề thi môn Tài chính) (Có đáp án)
Module 1 PV, FV Annuities SEP13
New m1,2,3,4
Option Pricing Binomial Black Scholes (Module 12) (Hướng dẫn định giá quyền chọn bằng mô hình nhị phân)
Chương 7.Cơ học lượng tử - Vật lý đại cương 3 - TS.Nguyễn Thị Trang
Chương 6.Quang học lượng tử - Vật lý đại cương 3 - TS.Nguyễn Thị Trang
Chương 5.Thuyết tương đối - Vật lý đại cương 3 - TS.Nguyễn Thị Trang
Chương 4. Tán xạ ánh sáng - Vật lý đại cương 3 - TS.Nguyễn Thị Trang
Chương 3.Phân cực ánh sáng - Vật lý đại cương 3 - TS.Nguyễn Thị Trang
Commentaires (0)
Aucun commentaire pour le moment. Soyez le premier !