[Slide dịch hợp đồng] Chapter 3: Negotiation inspection and defects liability

THThiNganHang
0 Downloads
35
0

Inhalt des Dokuments

Seite 1

CONTRACT Teacher : Lê Hồng Linh ( MA) Tel: 0903 978 552 Email : lehonglinh.ftu@gmail.com ThiNganHang.com ThiNganHang.com 1 1

Seite 2

CHAPTER: 3 NEGOTIATION INSPECTION AND DEFECTS LIABILITY The Problem: When things go wrong with the exported products, repair and replacement can be ruinously expensive. There are some special steps that the exporters can take to minimize the risk of the goods being rejected or of heavy defects liability claims. ThiNganHang.com ThiNganHang.com 2 2

Seite 3

CHAPTER: 3 NEGOTIATION INSPECTION AND DEFECTS LIABILITY The Principle: + The exporter should ensure that all exported goods meet or exceed the quality specified, that marking and packaging are correct and that delivery is on time. + The agreement between the parties should contain specific quality specifications. ThiNganHang.com ThiNganHang.com 3 3

Die ersten 3 Seiten werden angezeigt. Laden Sie das Dokument herunter, um alles zu sehen.

Kommentare (0)

Anmelden um an der Diskussion teilzunehmen

Noch keine Kommentare. Seien Sie der Erste!